NZ Bus adds another 43 buses to the west Auckland fleet and uses EVisi siteCharge software to manage peak power demand at the New Lynn electrici bus charge site.
EVisi siteCharge automates and optimises EV charger operations without site operators to manually control power of ache charge connector.
siteCharge optimisation algorithms continually assess electric bus charging requirements and adjust charger connector power to deliver power to buses to have them charged on time while enasuring Vector networks electrical infrastructiure insnt over loaded.
More information at